20
Overheard a foreman say something at the lumber yard that made me wary
I was picking up cedar pickets near the framing lumber section and heard a foreman tell his apprentice to just 'send it' on some 2x6s with a visible split in the end grain. Tbh that kind of attitude is how you get callbacks for buckled decks and trash framing inspections, has anyone else seen shortcuts like that blow up on a job?
3 comments
Log in to join the discussion
Log In3 Comments
janarivera7d ago
Did that split run the whole length or just the end?
8
Man, I had a buddy who built a deck with wood like that and it split clean in half six months later.
-1
faithcampbell8d ago
Damn, that's rough. What kind of wood was it, and did he seal it at all before building?
I'm trying to figure out if it was just bad lumber or if he skipped some prep steps that would've kept it together longer.
Hate when cheap cuts like that waste your time and cash like that.
6