Saw a crew in Tulsa stapling straight into a slab with no pad, still think about it
Walked into a new build off 71st in Tulsa last month for a measure and the other crew was stretching carpet right onto bare concrete, no pad anywhere. They were shooting staples every 4 inches and the backing was already tearing at the seams, and the GC told me it was fine because the homeowner would never pull the carpet back. Am I crazy for thinking I should say something, or do you just let a job like that go?